迅成建筑
News

Address: Industrial Zone, Shunde District, Foshan City Magang
Business Phone 0757 -28,328,212
BusinessQQ:271026155

Home > News
Knowledge of construction: concrete mixer operational safety
Click:Secondary,Time:2014-07-22
[Problem] concrete mixers operate trainees safety requirements?

[Answer] 1. Concrete mixer should be installed on a flat solid place and Chock stable. Console should pad plastic plates or dry wood.

2 should be checked before starting the machinery, security guards and rollers, confirm the safety equipment, no tools, debris inside the drum.

3 feed process, is strictly prohibited head or hand into view between the hopper and the frame or Tanmo.

4 hopper rises beneath prohibited in the job. Measures must be taken to clean up the feed hopper fixed firmly former pit.

5 during operation shall not be inserted into the mixer in the hands or tools.

6 When operating personnel should concentrate, not free to leave their posts. When concrete mixer malfunction, immediately turn off the power.

Top 7. Operators into stirring drum maintenance and cleaning, you must cut off the power, remove the fuse in the power box town, and let someone care.

8 After the job should fall to the hopper hopper pit. Hopper when the hopper is raised must be fixed.

According to the above questions are finishing the practical work experience participants made ​​reference, any questions, please timely communication, correct me.